Select from the option that best answers Question 5, which is provided in the Topic 3 Workshop.
Answer Question 4 (as provided in the Topic 3 Workshop), by selecting the best option below.
There are a variety of different techniques utilised to structure and define the Workstreams, elements, and work packages in a WBS. Five of these methods are outlined in this question. On
the left-hand side of this question you will see a range of different methods outlined. To the right of each
of these is a selection box. In each of
these boxes, select the term that is used to define the approach described on
the left hand side of each option.
Hint: Read the sentences carefully and understand the terms and their meaning. If you have any doubts, please review the Topic 3 lecture material. Please also note that each of the terms for each method should only be used once.Select True or False in relation to the statement made in Question 2 within the Topic 3 lecture.
Please answer Question 1, which is provided in the Topic 3 lecture, by selecting the most appropriate option from those provided below. Note that the terms you will need to define have been replaced with the codes 'X' and 'Y'.
Using
the PERT formula provided in the Topic 4 lecture, calculate
the Weighted Average
Duration for an activity, where the
estimates are provided in the Question 5 scenario (see the Topic 4 Workshop).
Hint: Use the formula that was providedIdentify the duration of the critical path from the Arrow Diagramming Method model, which is provided in Question 4 (outlined in the Topic 4 Workshop). Hint: There is only one correct answer. Consequently, check your pathway calculations carefully before selecting your option.
From the descriptions provided on the left, match these to the options available in the boxes to the right. Hint: Please read the options carefully. Additionally, please be aware that the full terms are not included and only the abbreviations are supplied. It is important that you remember these abbreviations, as these are used when developing your Work Breakdown Structure (WBS).
Answer Question 4, which is provided in the Topic 2 Workshop, by selecting the correct listing from the following options. Hint: If you are unsure, make sure that you look at the Topic 2 lecture material, to refresh your memory on the steps.