An engineering firm is evaluating a project that requires an initial investment of $250,000 and will generate the following net cash flows:

  • Year 1: $80,000

  • Year 2: $90,000

  • Year 3: $100,000

  • Year 4: $110,000

The firm's required rate of return (discount rate) is 12%. Based on this information, which of the following is the closest to the correct NPV, and what should the firm decide?

Переглянути це питання
A company is comparing two crane purchase options. Crane A costs $5 million with $1 million in annual operating costs and lasts 5 years. Crane B costs $3 million with $1.1 million in annual operating costs and lasts 3 years. Using a discount rate of 10%, the equivalent annuities are $2.319 million and $2.306 million respectively. Based on this analysis, which of the following is the most accurate economic interpretation?
Переглянути це питання

A company uses the power-law model Y=AXBY=AXB to scale equipment cost with capacity, where 0<B<10<B<1. Which of the following best explains why B>1B>1 is not typically observed in capital cost estimation for engineering equipment?

Переглянути це питання

A project has the following projected cash flows:

  • Year 0: -$100,000 (initial investment)

  • Year 1: +$30,000

  • Year 2: +$40,000

  • Year 3: +$50,000

Which of the following statements about Internal Rate of Return (IRR) is true?

Переглянути це питання
In the context of engineering decision-making under uncertainty, which of the following best explains why the Expected Value approach may fail when assessing extreme or "black swan" events?
Переглянути це питання
Which of the following limitations of the Payback Period method is least significant when assessing long-term public infrastructure projects?
Переглянути це питання
An engineering firm is considering two new projects. Project A has an expected value (EV) of $15 million and a standard deviation (SD) of $105 million. Project B has an EV of $10 million and an SD of $15.5 million. If the company decides to invest 50% in each project and assumes the outcomes are uncorrelated, what is the standard deviation of the combined investment portfolio?
Переглянути це питання

You perform a life cycle analysis on a new electronic device product by solely analysing the economic effects of that product in different phases:

  • production, 
  • usage, 
  • and end-of-life, including deconstructing the product and reusing components in other devices

This analysis could be described as:

Переглянути це питання

According to its Diversity and Inclusion

Positioning statement, Engineers Australia’s 

commitment towards achieving a diverse and inclusive workforce is

demonstrated by the following activities:

(Select all the correct options.)

0%
Переглянути це питання

Which of these pieces of information can the found/interpreted using the social impact audit tool?

Переглянути це питання