Calculate the corrected adjusted output of the excavators. Use the following num...

✅ The verified answer to this question is available below. Our community-reviewed solutions help you understand the material better.

Calculate the corrected adjusted output of the excavators. Use the following numbers: 

volume (capacity) of bucket is 1m3;

cyle-time (single period) is 120 s;

bucket fill factor is 0.7;

soil loosening factor is 1.3;

time efficiency factor is 0.6.